In a cleanroom environment, the requirements for equipment and material handling are not only high efficiency and precision, but also strict compliance with hygiene, safety and operating regulations. As a precise and efficient material handling equipment, cleanroom light suspension cranes are widely used in clean production lines in the pharmaceutical, electronics, food and other industries.

Cleanroom light suspension crane

Installation steps of cleanroom light suspension cranes

Site preparation

  ● Before installation, the installation site must be fully prepared. Make sure there is no debris in the cleanroom and the installation space meets the size and requirements of the crane. Clean all work areas, ensure that there are no physical obstacles when installing the equipment, and check whether the power supply meets the electrical requirements of the equipment.

Installation of frame and track

  ● Installing the crane's track system is a key step in the entire installation process. The track needs to be fixed horizontally and firmly to the ceiling or wall, which requires ensuring that the strength of the bracket and the fixing point is sufficient to withstand the load of the crane. Pay special attention to the straightness of the track during installation to ensure that the crane can run smoothly.

Installation of crane operation system

  ● After the track is installed, the main part of the crane, including the electric hoist, drive system, suspension device, etc., is installed next. Make sure that all components are properly docked and the installation position and angle meet the design requirements. Pay special attention to the wiring of the electric system to ensure that it complies with safety regulations.

Installation of safety devices

  ● Any lifting equipment needs to be equipped with safety devices, such as overload protection, limit switches, etc. For clean room light suspension cranes, these safety devices can effectively avoid unnecessary risks during use. During installation, ensure that these safety devices can operate normally and work in conjunction with the main control system.

Commissioning and testing

  ● After installation, detailed commissioning and testing are essential. During the commissioning process, ensure that the crane runs smoothly and check whether its load capacity, lifting accuracy, speed control and other aspects meet the standards. After commissioning, multiple tests should be carried out to ensure the safety and operating efficiency of the equipment.

Suspension monorail bridge crane

Through precise installation, reasonable planning and meticulous safety measures, the equipment can be ensured to operate stably in a clean room environment, improve material handling efficiency, and meet the industry's strict hygiene and safety standards. Welcome to contact us to provide you with comprehensive product support and installation services.

Related Post

Design Features of Clean Room Belt Crane

Our cleanroom belt crane feature anti-static polyurethane belt hoists that meet ISO Class 100 standards and are ideal for material handling in the semiconductor, pharmaceutical and precision manufacturing industries.

What is a Cleanroom Chain Hoist

Cleanroom chain hoist is a lifting device designed for cleanroom environment, widely used in pharmaceutical, electronics and food industries.

250kg Stainless Steel Manual Gantry Crane in Vietnam

The stainless steel manual gantry crane uses corrosion resistant 304 stainless steel structure, flexible to move and adjustable in height, for light lifting solutions in cleanroom environments.

Advantages of Electric Fiber Rope Hoist Cranes

Rope hoist cranes use high-strength synthetic fiber ropes, lighter weight, higher safety factor and corrosion resistance, smooth operation, suitable for clean rooms and precision manufacturing scenarios.