Installation of Cleanroom Light Suspension Crane

  • 854 Views
  • 21-Mar-2025

In a cleanroom environment, the requirements for equipment and material handling are not only high efficiency and precision, but also strict compliance with hygiene, safety and operating regulations. As a precise and efficient material handling equipment, cleanroom light suspension cranes are widely used in clean production lines in the pharmaceutical, electronics, food and other industries.

Cleanroom light suspension crane

Installation steps of cleanroom light suspension cranes

Site preparation

  ● Before installation, the installation site must be fully prepared. Make sure there is no debris in the cleanroom and the installation space meets the size and requirements of the crane. Clean all work areas, ensure that there are no physical obstacles when installing the equipment, and check whether the power supply meets the electrical requirements of the equipment.

Installation of frame and track

  ● Installing the crane's track system is a key step in the entire installation process. The track needs to be fixed horizontally and firmly to the ceiling or wall, which requires ensuring that the strength of the bracket and the fixing point is sufficient to withstand the load of the crane. Pay special attention to the straightness of the track during installation to ensure that the crane can run smoothly.

Installation of crane operation system

  ● After the track is installed, the main part of the crane, including the electric hoist, drive system, suspension device, etc., is installed next. Make sure that all components are properly docked and the installation position and angle meet the design requirements. Pay special attention to the wiring of the electric system to ensure that it complies with safety regulations.

Installation of safety devices

  ● Any lifting equipment needs to be equipped with safety devices, such as overload protection, limit switches, etc. For clean room light suspension cranes, these safety devices can effectively avoid unnecessary risks during use. During installation, ensure that these safety devices can operate normally and work in conjunction with the main control system.

Commissioning and testing

  ● After installation, detailed commissioning and testing are essential. During the commissioning process, ensure that the crane runs smoothly and check whether its load capacity, lifting accuracy, speed control and other aspects meet the standards. After commissioning, multiple tests should be carried out to ensure the safety and operating efficiency of the equipment.

Suspension monorail bridge crane

Through precise installation, reasonable planning and meticulous safety measures, the equipment can be ensured to operate stably in a clean room environment, improve material handling efficiency, and meet the industry's strict hygiene and safety standards. Welcome to contact us to provide you with comprehensive product support and installation services.

Related Post

How to Choose Cleanroom Corrosion Resistant Cranes

Cleanroom corrosion resistant cranes provide customers with high-cleanliness lifting and handling solutions from materials and surface treatment, sealing and dustproof design to load capacity and control system.

Design Features of Clean Room Belt Crane

Our cleanroom belt crane feature anti-static polyurethane belt hoists that meet ISO Class 100 standards and are ideal for material handling in the semiconductor, pharmaceutical and precision manufacturing industries.

Installation of Cleanroom Portable Adjustable Gantry Cranes

The clean room portable adjustable gantry crane has a lightweight structure and is easy to disassemble and move. It is suitable for lifting and moving heavy objects in places with high air quality requirements such as laboratories, medical and electronics industries.

Indoor Mobile Cleanroom Gantry Cranes from China

The cleanroom mobile gantry cranes adopt a modular design and precise positioning. It is an ideal handling equipment for precision laboratories, sterile production lines, and pharmaceutical workshops, and can be customized according to cleanliness level and layout.